Monday, September 6, 2021

Heart Quilt 6

It's almost two months since my previous post and about the only needlework done around here was finishing up the last three blocks of the heart quilt.  All the blocks have been stitched together and quilted, so only the borders needs to be added.


Crazy hearts from Molly Mine

On a personal front it was quite a difficult few moths behind me workwise.  After going back to the UK firm in April, everything was going well until the mid of August when they decided they didn't have enough work to occupy me and let me go.  And I have been struggling ever since getting another job lined up as things in South-Africa is very tight with all the SOE's bankrupt and me being in the engineering (infra structure) field, you are dependent from the national and local governments for work.  I am praying that the contract work I have applied for do materialize so that I could go back to being the normal me without all these external pressures, worries and stress.  It is not a picnic finding oneself without a job just a few years before pension. 😓

If any of you reading here can join me in prayer about this I would really appreciate it.

Store opened on Oregon Patchworks

Ever since winning the full Embroidery Studio by Sierra in 2004, I dabbled with digitizing designs as well as wanting to open an online stor...