This quilt I wrote about way back in December 2012, is finally finished and just in time to be used as a lap quilt for the coming winter.
Lily was inspecting it all the way
and made sure she was the first one to try it out.
![]() |
| Construction playmat along the lines of Snakes and Ladders |
![]() |
I used the green glitter foam for the Go block
|

After three months of juggling two jobs as well as coping with an ill husband, I was finally able to finish up Set 3 of these designs. If y...